Fisher & Paykel Smart Drive Wind Turbine, Part 3: Hub, Blades and Furling Mount
With the Fisher & Paykel Smart Drive rewired, decogged and rectified (see parts 1 and 2 ), it needed something to turn it. This part covers the blade hub, the furling mount, the blades themselves and a test stand. Prices are what I paid around 2014. The blade hub The hub bolts to the Smart Drive's rotor and holds the blades. I used a six-blade hub milled from a solid block of aluminium. It takes six lengths of steel pipe with a one-inch (25.4 mm) outside diameter, and the blades slide over the pipes. Six-blade milled aluminium hub: $255 plus postage A three-blade version was also available for $200 Both came from a builder selling parts through The Back Shed forum. The six-blade milled aluminium hub. The furling mount The main mount fits the standard stainless-steel shaft from the Fisher & Paykel washing machine. It's a furling mount. In very strong winds, the turbine swings sideways out of the wind so it doesn't over-speed. It's the main mech...